You want to buy a pool kit, but you are unsure about the material to choose.

Distripool has selected very good quality concrete kit swimming pools for you: Discover the advantages of this material! Why buy a swimming pool inconcrete kit? The main advantage of concrete is its unfailing strength. If you want to build a swimming pool that will remain impeccable in the long term, despite the weather conditions, we recommend that you choose this material. The concrete kit swimming pool is a classic: you will be sure not to make a mistake by choosing this type of construction.

Clickhere to consult our guide and find out more.

Sort by:

Swimming pool purchasing guide > The price of a concrete swimming pool

Distripool offers you if you are manual to build your concrete swimming pool yourself :this will turn out to be much more economical, even if you have to, well obviously, buy building materials.




kit piscine catalogue


What is the cost of building materials and masonry for my concrete swimming pool?

Here are the different items of expenditure which concern the masonry of our concrete swimming pool kit.

Attention the prices below are indicative and may change depending on the region:

The cost of the slab:|| |1313


cout maconnerie beton dalle piscine



Les matériaux pour les murs de la piscine en fer et bloc :

cout ferraillage beton piscine beton

Materials for the walls of the concrete swimming pool:

cout materiaux beton piscine beton1
cout materiaux beton piscine beton2


You will now move on to assembling your concrete swimming pool. In this part of our swimming pool technical guide, you will find numerous advice so that each step goes smoothly.

The installation of the concrete swimming pool

" Properly setting up your swimming pool kit means you can take full advantage of it with a minimum of constraints for maximum pleasure."

The chosen location must be on stable and original ground and not on backfill for perfect longevity of your installation.

Location of your concrete swimming pool must be well exposed to the sun, avoiding as much as possible the shadows cast to allow a period of optimal use.

Avoid trees and other bushes are imperative, in order to avoid the recovery of leaves in the basins as well as clogging of the filter and pump.

Finally, find out about the underground networks passing the location of the concrete swimming pool, in order to avoid accidents during excavations.

implantation-piscine-kit-beton

The choice of the type of construction will condition the earthworks, in effect when tracing it will be necessary to take into account the width of the concrete block on the entire periphery of the swimming pool, as well as the dimensions of the passage technique.

Step 1: the delimitation of the earthwork for your concrete swimming pool

As a general rule it is advisable to take 0.20 m minimum for the thickness concrete blocks and 0.30 m minimum for the technical passage.

The tracing will be carried out using a construction spray, taking care to keep marks in the corners.

Au level of right angles, it is appropriate to apply the so-called "method of 3,4,5", take great attention also of the parallels of the pelvis and the existing construction.

tracage-piscine-kit-beton

Step 2: earthworks


A Once the pool is demarcated and traced, it is appropriate to calculate the volume of earth to be extracted in order to quantify the number of trucks of earth to be evacuate or to know the necessary storage space.

The earthworks will be done using a mini-excavator type construction machine, or tracked excavator:


terrassement-piscine-kit-beton terrassement-kit-piscine-beton


volume terrassement piscine

Step 3: the masonry of the swimming pool

 

The first step before any construction, is to inquire with services from your town hall and submit the building permit or the prior declaration of works.

Different exemption from administrative formalities exist depending on the surface area of ​​the pool (less than or equal to 10 m²), but also over time installation (administrative exemption for an installation of less of 3 months ).

Once the administrative formalities have been completed, the construction of the swimming pool in concrete kit itself can start...

The first phase is the construction of the base.

With a dimension of +/- 17 cm thick, it will be carried out on a bed of gravel called "hedgehog". Its function will be to raise the surface of the bottom of the excavation, its thickness will be 10 cm.

In order to avoid clogging of the drain, it will be necessary to plan the installation of a geotextile, bidim type.

It will therefore be necessary , between the thickness of +/- 17 cm for the base and 10 cm for the hedgehog, take it into account during the earthworks for the bottom of the excavation


radier-piscine-kit-beton radier-kit-piscine-beton


With all this, it will be necessary to put in place a polyane film on the hedgehog in order to protect it from clogging by the concrete of the raft. In order to prevent any deformation of the pelvis due to the vertical thrust of the ground, it will be necessary to "reinforce " with2 layers of welded mesh.

This mesh like any reinforcing steel must be coated per 5 cm of concrete minimum. The position between the two layers will be ensured by the installation of a tablecloth spacer called SAT, to position all meters.

radier-kit-beton-piscine

radier-piscine-beton-kit

maconnerie-piscine-kit-beton

maconnerie-traditionnelle-piscine-beton

So to ensure the anchoring of the bars in the base, it will be necessary to position " U "in vertical hold at the edge chaining of the raft, a covering of 50 cm minimum will be operated.

Two constructions are possible in our concrete swimming pool kits for the creation of your pool, informing blocks, or inconcrete blocks traditional.

Construction using formwork blocks requires double reinforcement of the sail, during the construction process horizontal reinforcement and vertical, once the assembly has been carried out with respect for the reinforcement, all you have to do is bring in a concrete mixer to fill the concrete forming blocks and thus stiffen the structure. This technique is also feasible during block construction Polystyrene.

ferraillage-kit-piscine construction-piscine-polystyrene

construction-piscine-kit-polystyrene piscine-kit-beton-feutre-bidim

For traditional construction (in concrete blocks or agglos), you It will be necessary to create a low and high belt, each made up of 3 twisted irons of 8 mm, stiffening posts will be made every 2 Maximum meters, reinforced by 2 twisted irons of 8 mm.

maconnerie-traditionnelle-beton-piscine

maconnerie-piscine-traditionnelle

maconnerie-traditionnelle-piscine

maconnerie-kit-piscine-beton


Step 4: the parts of the concrete swimming pool in kit to be sealed

It These are the parts to be put in place for suction and delivery pond water. It is advisable to systematically install parts to be sealed liner, even on a concrete swimming pool, so in case intervention on a sealing problem, it is possible at a lower cost costs of installing a liner or polyester covering without having to change the parts.

The Skimmer.

He aims to maintain the pool water surface perfectly clean, its position in the basin will take into account the prevailing winds and of the hydraulic principle of the basin. Connected to the suction of the group filtration, the skimmer can quickly absorb impurities from surfaces, it seals between 2 and 4 cm under the coping.

The flow rate of a skimmer is 7 m³/h maximum, for pipes with a diameter of 50 mm.

The suction speed of family swimming pools is between 2.5 and 3 m/s, we consider 1 skimmer for 25 m³ of water.

skimmer-hauteur

Discharge nozzles.

They are used to distribute the filtered water on its return to the basin, it is adjustable jet thus allowing the jet to be directed towards the surface.

The number of discharge nozzles must be equal to or greater (+1 generally) than the number of skimmers.

The flow rate of a discharge nozzle is 6 m³/h, it is sealed between 35 and 50 cm from the axis of the room under the coping.

refoulement-hauteur

Broom socket.

Its role is to connect the manual pool broom, but also a hydraulic robot cleaner with overpressure.

The broom socket must be placed in the center of the length of the pool, it finds itself equipped with a PN 16 bar pipeline, in no case does it participates in water recycling.

It is sealed between 20 and 30 cm from the axis of the room under the coping.

prise-balai-hauteur

The bottom drain.

Its main function is to allow the pool to drain.

She is positioned either in the large bath for pools with a pit dive, either in the center of the pool for flat-bottomed pools, it also allows the suction of the heaviest impurities falling into the bottom of the pool.

A bottom drain with an average flow rate of approximately 6 m³/h.

bonde-de-fond-dimensions

The projector.

The projector allows you to light up your pool after dark in order to to obtain another more cozy atmosphere in your pool, there are halogen projector and since LED projectors, the latter have a longer lifespan is power consumption60 times less than a halogen, an LED spotlight consumes13 W.

It is sealed between 45 and 55 cm under the coping.

projecteur-hauteur